Energy Upgrade to Ballincollig home

This fine house was constructed in 2004. The clients found the house impossible to heat with winter heating cost at several hundred Euro bi-monthly. With the boiler running almost constantly, the living area was always cold, and the kitchen so hot they sometimes had to open the windows.

PMNA carried out a survey, cost report and agreed a scope of works. We brought in a project manager to co-ordinate the tradespeople needed, as some of the technical solutions required specialist investigations to determine the failures in the existing systems. hayfield

“I found Paul to be a good listener and take any suggestions you may have on board. He is always available when needed. I was very happy with him as my architect as he carries out his work very professionally. I would not hesitate to employ him again in the future. I would be very happy to recommend him to others. (Seamus Curran)”