The PassivHAUS architecture company

Mill Office Conversion

 

Completed in summer 2018, this Woolen Mill originally dated from 1896 by Howdill and Howdill of Leeds. It had fallen into disrepair until the client, O.R.M. Ltd. decided to invest in its resurrection as a contemporary office building. Lovingly restored, we inserted a modern front entrance, a canopy to protect the stonework, completely rebuilt the roof and insulated to best-practice, with materials compatible with the existing lime mortar and stone walls. The original cast-iron details, timbers and flooring were retained where possible. Excellent air-tightness was achieved and heat recovery ventilation provided. No air-conditioning required!

Contact Us

021 242 9455 23 The Rise Bishopstown Cork Ireland T12 H6D2